About Superfund
The word behind the orange boundary on the Surveyor’s map — and behind all five of this fall’s studio sites.
What it is
Superfund is the United States’ program for cleaning up the country’s most contaminated land. Congress created it in 1980 with a law called CERCLA, in the aftermath of Love Canal — a Niagara Falls neighborhood built on a buried chemical dump. The law did two radical things: it made polluters legally responsible for cleaning up messes they made decades earlier, and it created a trust fund — the “superfund” — so the government could act when no responsible party could pay.
The worst sites go on the National Priorities List (NPL) — about 1,300 places today, from abandoned mines to old smelters, wood-treating yards, and landfills. Listing is not a condemnation of a town; it is the federal government committing to a decades-long cleanup. Every site on the list has a public paper trail — investigations, decisions, five-year reviews — which is exactly what makes these sites teachable ground for a design studio.
How a place gets listed
- Discovery — a spill, a sick community, a state referral, or an old industrial record puts a site on EPA’s radar.
- Assessment — inspectors sample soil, water, and air, and trace who is exposed.
- Scoring — the Hazard Ranking System turns that evidence into a number; 28.5 or above qualifies for the NPL.
- Proposal & listing — the site is proposed in the Federal Register, the public comments, and listing becomes final. (Tar Creek was in the very first NPL class of 1983.)
The long arc of a cleanup
A Superfund cleanup is a decades-long civic project: a deep investigation (RI/FS) of what is where and what could be done; a public decision (the Record of Decision) choosing the remedy; then design and construction of that remedy, operable unit by operable unit. Big sites are split into operable units so a town’s yards can be cleaned while the mine pool is still being studied.
“Clean” rarely means gone. Remedies often contain rather than remove — caps, slurry walls, water treatment running indefinitely — and institutional controls (deed restrictions, digging bans) manage what remains. EPA re-checks every remedy in public five-year reviews for as long as contamination stays on site. For a designer this is the crucial mindset: on a Superfund site, the remedy itself is part of the landscape you are given — Tar Creek’s chat piles, the pumped water level in Butte’s Berkeley Pit, Onondaga’s white waste beds, Homestake’s tailings mesa and Palmerton’s cinder bank are all designed ground.
Who pays? The polluter, wherever possible — companies are traced through decades of mergers and made to fund the work. Where no one solvent remains (an “orphan” site), the trust fund and congressional appropriations carry it, which is why some cleanups wait in line for years. Tar Creek is the hard case: most of the companies that dug the ore dissolved long ago, so much of the work has leaned on public money and on the Quapaw Nation’s own initiative.
The vocabulary — for reading EPA documents
- CERCLA
- The 1980 law behind it all — the Comprehensive Environmental Response, Compensation, and Liability Act. “Superfund” is its nickname, after the cleanup trust fund it created.
- NPL
- National Priorities List — the roster of the country's most serious contaminated sites. “Listed” means a site is on it; “deleted” means cleanup goals were met.
- EPA ID
- The site's permanent ID in EPA's system (e.g. OKD980629844). The Surveyor uses it to pull the record — it's the key to every document.
- HRS
- Hazard Ranking System — the screening score (0–100) that decides listing. 28.5 or above qualifies a site for the NPL.
- OU
- Operable Unit — a big site is cleaned in numbered pieces (OU1, OU2…), each with its own studies and decisions. Tar Creek has several; so do Butte and Onondaga Lake.
- RI/FS
- Remedial Investigation / Feasibility Study — the deep site characterization (what's where, how bad) and the menu of cleanup options with costs.
- ROD
- Record of Decision — the signed public document choosing the cleanup remedy. The single best thing to read about what will happen on a site.
- PRP
- Potentially Responsible Party — the polluters (owners, operators, waste generators, transporters) the law makes pay. Honeywell at Onondaga Lake; mining companies' successors at Tar Creek.
- Institutional controls
- Legal limits that manage leftover risk — deed restrictions, digging prohibitions, groundwater-use bans. They shape what can be designed and built on a site, sometimes forever.
- Five-year review
- After cleanup, EPA re-checks the remedy every five years for as long as contamination remains. The reviews are public — the freshest honest status of a site.
- Construction complete
- The physical remedy is built — NOT the same as clean. Containment, caps, and pumping may run indefinitely underneath.
- TAG
- Technical Assistance Grant — money for community groups to hire their own experts to interpret EPA's science. Community voices are part of the record.
Why this studio works on them
Almost every one of our five sites made the materials of ordinary American building — the lead and zinc that galvanized its steel and coloured its paint, the copper in its wiring and plumbing, the soda ash behind its glass and cement and the chlorine behind its PVC. Homestake is the exception that sharpens the rule: its uranium went to warheads and reactors, and what the milling left the landscape instead was the ground itself, 22 million tons of it. The contamination is the other half of the ledger for the built world we inherited. Designing on these sites means taking that ledger seriously: reading the remedy, respecting the institutional controls, and asking what public life a repaired ground can hold — as the Lehigh Gap Nature Center on Palmerton’s stripped mountain and the Onondaga Nation’s own vision for its lake already begin to answer.
Load each site’s full record with one click from the Surveyor’s studio-site buttons: Tar Creek · Butte · Onondaga Lake · Homestake · Palmerton.
Go to the sources
- EPA — Superfund home ↗
The program's front door: how it works, national lists, cleanup process.
- EPA — the National Priorities List ↗
What listing means, plus current, proposed, and deleted sites.
- EPA — Search Superfund sites where you live ↗
The map of every NPL site — find the ones near home.
- EPA — summary of CERCLA (the law) ↗
The statute in plain language: liability, the trust fund, the federal role.
- EPA — Superfund redevelopment ↗
Sites returned to use — parks, solar fields, housing — the design conversation this studio joins.
- ATSDR — public health at hazardous sites ↗
The federal health agency for contaminated places; its site assessments pair with EPA's engineering record.
For any single site, the deepest reading is its own EPA profile — the Surveyor links each studio site’s listing narrative, decisions, and progress reports right on the results page.